Alas 11:00 ng gabi ngayong Biyernes (Feb. 7) magsisimula ang reblocking ng Department of Pulic Works and Highways (DPWH).
Apektado ng reblocking ang sumusunod na mga lansangan:
A. BONIFACIO (southbound)
– Cloverleaf hanggang 11th Avenue, 1st lane mula sa sidewalk
EDSA (southbound)
– Bulakan Street hanggang West Avenue, 1st lane mula sa sidewalk
– Approach ng P. Tuazon flyover hanggang approach ng A. Boni Serrano flyover, 2nd lane mula sa MRT
EDSA (northbound)
– Lagpas ng Aurora Blvd., hanggang New York Street, 3rd lane mulasa sidewalk
GENERAL LUIS STREET (eastbound)
– Samote Street to SB Diversion Road
ELLIPTICAL ROAD (westbound)
– mula Kalayaan Avenue hanggang Maharlika Street, 6th lane mula sa outer sidewalk
Tatagal ang repair at reblocking hanggang alas 5:00 ng umaga ng Lunes (Feb. 10).